  "published_at": "2026-10-02T16:54:03Z",
  "as_of_curated": "2026-07-26",
  "build_weight_covered": 0.5,
  "teaser": [
    {
      "vendor": "gev",
      "name": "GE Vernova",
      "stale": false,
      "figure": {
        "metric": "RPO, total company",
        "kind": "backlog",
        "basis": "rpo",
        "scope": "group",
        "value": 176.3,
        "unit": "usd_b",
        "period": "2026-06-30",
        "asof": "2026-07-22",
        "quote": "RPO was $176.3 billion and $128.7 billion as of June 30, 2026 and 2025, respectively.",
        "src": {
          "label": "GE Vernova Q2 2026 10-Q (SEC EDGAR)",
          "url": "https://www.sec.gov/Archives/edgar/data/1996810/000199681026000148/gev-20260630.htm"
        }
      }
    },
    {
      "vendor": "vrt",
      "name": "Vertiv",
      "stale": true,
      "figure": {
        "metric": "Book-to-bill, total company",
        "kind": "book_to_bill",
        "basis": "order-backlog",
        "scope": "group",
        "value": 2.9,
        "unit": "ratio",
        "period": "2025-12-31",
        "asof": "2026-02-11",
        "quote": "Fourth quarter 2025 book-to-bill ratio was ~2.9x and backlog increased to $15.0 billion, up 109% compared to the same period last year.",
        "src": {
          "label": "Vertiv Q4 2025 8-K exhibit 99.1 (SEC EDGAR)",
          "url": "https://www.sec.gov/Archives/edgar/data/1674101/000167410126000006/exhibit991vrt02112026.htm"
        }
      }
    }
  ],
  "packages": [
    {
      "code": "switchgear",
      "label": "Switchgear & switchboard",
      "weight": 0.14,
      "price_yoy_pct": 12.27,
      "price_last_obs": "2026-08-01",
      "contribution_pp": 1.72,
      "null_note": null,
      "backlog_group": "electrical",
      "vendors": [
        {
          "key": "etn",
          "name": "Eaton",
          "ticker": "ETN",
          "listed": "NYSE",
          "dc_segment": "Electrical Americas & combined Electrical businesses",
          "cadence": "quarterly",
          "stale": false,
          "figures": [
            {
              "metric": "Backlog growth, Electrical Americas",
              "kind": "backlog_growth",
              "basis": "order-backlog",
              "scope": "segment",
              "value": 33.0,
              "unit": "pct_yoy",
              "period": "2026-06-30",
              "asof": "2026-07-31",
              "quote": "The twelve-month rolling average of orders in the second quarter was up 41% organically. Total backlog at the end of June remained strong and was up 33% over June 2025.",
              "src": {
                "label": "Eaton Q2 2026 8-K exhibit 99 (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1551182/000155118226000027/etn06302026exhibit99.htm"
              }
            },
            {
              "metric": "Book-to-bill, Electrical (rolling 12-mo)",
              "kind": "book_to_bill",
              "basis": "order-backlog",
              "scope": "segment",
              "value": 1.2,
              "unit": "ratio",
              "period": "2026-06-30",
              "asof": "2026-07-31",
              "quote": "On a rolling twelve-month basis, the book-to-bill ratio for the Electrical businesses remained strong at 1.2.",
              "src": {
                "label": "Eaton Q2 2026 8-K exhibit 99 (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1551182/000155118226000027/etn06302026exhibit99.htm"
              }
            }
          ],
          "null_note": null
        },
        {
          "key": "abb",
          "name": "ABB",
          "ticker": "ABBN.SW",
          "listed": "SIX / NYSE",
          "dc_segment": "Electrification",
          "cadence": "quarterly",
          "stale": false,
          "figures": [
            {
              "metric": "Order backlog, Electrification segment",
              "kind": "backlog",
              "basis": "order-backlog",
              "scope": "segment",
              "value": 13.676,
              "unit": "usd_b",
              "period": "2026-06-30",
              "asof": "2026-07-16",
              "quote": "Order backlog (end June) ... Electrification 13,676 8,685 57% 59% 59%",
              "src": {
                "label": "ABB Q2 2026 results (news center)",
                "url": "https://new.abb.com/news/detail/137496/q2-2026-results"
              }
            },
            {
              "metric": "Order backlog, total company",
              "kind": "backlog",
              "basis": "order-backlog",
              "scope": "group",
              "value": 30.007,
              "unit": "usd_b",
              "period": "2026-06-30",
              "asof": "2026-07-16",
              "quote": "The order backlog amounted to $30,007 million, up 27% (28% comparable) year-on-year.",
              "src": {
                "label": "ABB Q2 2026 results (news center)",
                "url": "https://new.abb.com/news/detail/137496/q2-2026-results"
              }
            },
            {
              "metric": "Book-to-bill, total company",
              "kind": "book_to_bill",
              "basis": "order-backlog",
              "scope": "group",
              "value": 1.27,
              "unit": "ratio",
              "period": "2026-06-30",
              "asof": "2026-07-16",
              "quote": "Revenues were record-high but orders even stronger, leaving the book-to-bill at 1.27, supported by a positive development in all three business areas.",
              "src": {
                "label": "ABB Q2 2026 results (news center)",
                "url": "https://new.abb.com/news/detail/137496/q2-2026-results"
              }
            }
          ],
          "null_note": null
        },
        {
          "key": "schneider",
          "name": "Schneider Electric",
          "ticker": "SU.PA",
          "listed": "Euronext Paris",
          "dc_segment": "Energy Management",
          "cadence": "annual",
          "stale": false,
          "figures": [
            {
              "metric": "Backlog, Group (whole company)",
              "kind": "backlog",
              "basis": "order-backlog",
              "scope": "group",
              "value": 25.362,
              "unit": "eur_b",
              "period": "2025-12-31",
              "asof": "2026-02-26",
              "quote": "The Group closed the year with backlog of \u20ac25,362 million (2024: \u20ac21,420 million), up +18%.",
              "src": {
                "label": "Schneider Electric FY2025 Results release (se.com)",
                "url": "https://www.se.com/ww/en/assets/564/document/528237/release-fy-results-2025.pdf"
              }
            },
            {
              "metric": "Backlog, Energy Management segment",
              "kind": "backlog",
              "basis": "order-backlog",
              "scope": "segment",
              "value": 21.34,
              "unit": "eur_b",
              "period": "2025-12-31",
              "asof": "2026-02-26",
              "quote": "Backlog grew across both businesses, with Energy Management at \u20ac21,340 million, up +21%, and Industrial Automation at \u20ac4,022 million, up +8%.",
              "src": {
                "label": "Schneider Electric FY2025 Results release (se.com)",
                "url": "https://www.se.com/ww/en/assets/564/document/528237/release-fy-results-2025.pdf"
              }
            }
          ],
          "null_note": null
        },
        {
          "key": "gev",
          "name": "GE Vernova",
          "ticker": "GEV",
          "listed": "NYSE",
          "dc_segment": "Electrification",
          "cadence": "quarterly",
          "stale": false,
          "figures": [
            {
              "metric": "RPO, total company",
              "kind": "backlog",
              "basis": "rpo",
              "scope": "group",
              "value": 176.3,
              "unit": "usd_b",
              "period": "2026-06-30",
              "asof": "2026-07-22",
              "quote": "RPO was $176.3 billion and $128.7 billion as of June 30, 2026 and 2025, respectively.",
              "src": {
                "label": "GE Vernova Q2 2026 10-Q (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1996810/000199681026000148/gev-20260630.htm"
              }
            },
            {
              "metric": "Book-to-bill, Electrification segment",
              "kind": "book_to_bill",
              "basis": "order-backlog",
              "scope": "segment",
              "value": 1.7,
              "unit": "ratio",
              "period": "2026-06-30",
              "asof": "2026-07-22",
              "quote": "Orders of $6.3 billion increased +66% organically, driving a book-to-bill ratio of approximately 1.7, with continued strong demand for...",
              "src": {
                "label": "GE Vernova Q2 2026 8-K press release, Electrification segment (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1996810/000199681026000147/gevpressrelease2q26.htm"
              }
            }
          ],
          "null_note": null
        }
      ]
    },
    {
      "code": "transformers",
      "label": "Power & distribution transformers",
      "weight": 0.12,
      "price_yoy_pct": 7.61,
      "price_last_obs": "2026-08-01",
      "contribution_pp": 0.91,
      "null_note": null,
      "backlog_group": "electrical",
      "vendors": [
        {
          "key": "hitachi_energy",
          "name": "Hitachi Energy",
          "ticker": "6501.T (Hitachi Ltd)",
          "listed": "TSE",
          "dc_segment": "Hitachi Energy",
          "cadence": "quarterly",
          "stale": false,
          "figures": [
            {
              "metric": "Order backlog, Hitachi Energy segment",
              "kind": "backlog",
              "basis": "order-backlog",
              "scope": "segment",
              "value": 63.6,
              "unit": "usd_b",
              "period": "2026-06-30",
              "asof": "2026-07-29",
              "quote": "Order Backlog (as of June 30, 2026) ... Hitachi Energy : 10.3 tn yen (+12% vs end-FY2025) 63.6 bn USD (+10% vs end-FY2025)",
              "src": {
                "label": "Hitachi Q1 FY2026 (quarter ended June 30, 2026) results presentation",
                "url": "https://www.hitachi.com/content/dam/hitachi/global/en/press/files/2026/07/260729/2026_1Qpre.pdf"
              }
            }
          ],
          "null_note": null
        },
        {
          "key": "gev",
          "name": "GE Vernova",
          "ticker": "GEV",
          "listed": "NYSE",
          "dc_segment": "Electrification",
          "cadence": "quarterly",
          "stale": false,
          "figures": [
            {
              "metric": "RPO, total company",
              "kind": "backlog",
              "basis": "rpo",
              "scope": "group",
              "value": 176.3,
              "unit": "usd_b",
              "period": "2026-06-30",
              "asof": "2026-07-22",
              "quote": "RPO was $176.3 billion and $128.7 billion as of June 30, 2026 and 2025, respectively.",
              "src": {
                "label": "GE Vernova Q2 2026 10-Q (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1996810/000199681026000148/gev-20260630.htm"
              }
            },
            {
              "metric": "Book-to-bill, Electrification segment",
              "kind": "book_to_bill",
              "basis": "order-backlog",
              "scope": "segment",
              "value": 1.7,
              "unit": "ratio",
              "period": "2026-06-30",
              "asof": "2026-07-22",
              "quote": "Orders of $6.3 billion increased +66% organically, driving a book-to-bill ratio of approximately 1.7, with continued strong demand for...",
              "src": {
                "label": "GE Vernova Q2 2026 8-K press release, Electrification segment (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1996810/000199681026000147/gevpressrelease2q26.htm"
              }
            }
          ],
          "null_note": null
        }
      ]
    },
    {
      "code": "hvac_equip",
      "label": "AC & refrigeration equipment",
      "weight": 0.1,
      "price_yoy_pct": 3.91,
      "price_last_obs": "2026-08-01",
      "contribution_pp": 0.39,
      "null_note": null,
      "backlog_group": null,
      "vendors": [
        {
          "key": "vrt",
          "name": "Vertiv",
          "ticker": "VRT",
          "listed": "NYSE",
          "dc_segment": "Whole company \u2014 segments are geographic",
          "cadence": "quarterly",
          "stale": true,
          "figures": [
            {
              "metric": "Backlog, total company",
              "kind": "backlog",
              "basis": "order-backlog",
              "scope": "group",
              "value": 15.0,
              "unit": "usd_b",
              "period": "2025-12-31",
              "asof": "2026-02-11",
              "quote": "Fourth quarter 2025 book-to-bill ratio was ~2.9x and backlog increased to $15.0 billion, up 109% compared to the same period last year.",
              "src": {
                "label": "Vertiv Q4 2025 8-K exhibit 99.1 (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1674101/000167410126000006/exhibit991vrt02112026.htm"
              }
            },
            {
              "metric": "Book-to-bill, total company",
              "kind": "book_to_bill",
              "basis": "order-backlog",
              "scope": "group",
              "value": 2.9,
              "unit": "ratio",
              "period": "2025-12-31",
              "asof": "2026-02-11",
              "quote": "Fourth quarter 2025 book-to-bill ratio was ~2.9x and backlog increased to $15.0 billion, up 109% compared to the same period last year.",
              "src": {
                "label": "Vertiv Q4 2025 8-K exhibit 99.1 (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/1674101/000167410126000006/exhibit991vrt02112026.htm"
              }
            }
          ],
          "null_note": null
        }
      ]
    },
    {
      "code": "generators",
      "label": "Generator sets & turbines",
      "weight": 0.09,
      "price_yoy_pct": 5.27,
      "price_last_obs": "2026-08-01",
      "contribution_pp": 0.47,
      "null_note": null,
      "backlog_group": "turbines",
      "vendors": [
        {
          "key": "cat",
          "name": "Caterpillar",
          "ticker": "CAT",
          "listed": "NYSE",
          "dc_segment": "Power & Energy",
          "cadence": "quarterly",
          "stale": false,
          "figures": [
            {
              "metric": "MD&A backlog, total company",
              "kind": "backlog",
              "basis": "mdna-backlog",
              "scope": "group",
              "value": 72.1,
              "unit": "usd_b",
              "period": "2026-06-30",
              "asof": "2026-08-05",
              "quote": "At the end of the second quarter of 2026, the dollar amount of backlog believed to be firm was approximately $72.1 billion, about $9.4 billion higher than the first quarter of 2026. The order backlog increased across the three primary segments, with the largest increase in Power & Energy.",
              "src": {
                "label": "Caterpillar Q2 2026 10-Q, MD&A Order Backlog (SEC EDGAR)",
                "url": "https://www.sec.gov/Archives/edgar/data/18230/000001823026000046/cat-20260630.htm"
              }
            }
          ],
          "null_note": null
        },
        {
          "key": "cmi",
          "name": "Cummins",
          "ticker": "CMI",
          "listed": "NYSE",
          "dc_segment": "Power Systems",
          "cadence": "quarterly",
          "stale": false,
          "figures": [],
          "null_note": "Cummins discloses no backlog, order-backlog, orders, or book-to-bill metric in either its Q1 2026 10-Q (SEC EDGAR, filed 2026-05-05, accession 0000026172-26-000016, https://www.sec.gov/Archives/edgar/data/26172/000002617226000016/cmi-20260331.htm) or its matching Q1 2026 earnings release (8-K Ex-99, filed 2026-05-05, accession 0000026172-26-000013, https://www.sec.gov/Archives/edgar/data/26172/000002617226000013/cmi2026q18-kex99.htm) \u2014 both checked live 2026-07-26, zero hits for \"backlog\" or \"book-to-bill\" in either document. The only comparable aggregate is a Topic 606 remaining-transaction-price note in the 10-Q (\"NOTE 2. REVENUE FROM CONTRACTS WITH CUSTOMERS\"), which states $6.9 billion at March 31, 2026 for long-term arrangements the note itself describes as \"primarily long-term maintenance agreements, construction contracts, product sales with associated performance obligations extending beyond a year...\" \u2014 a maintenance-dominated aggregate, not an industrial equipment order-backlog metric comparable to peers on this board. Cummins is excluded on this basis."
        }
      ]
    },
    {
      "code": "pumps",
      "label": "Industrial pumps",
      "weight": 0.05,
      "price_yoy_pct": 3.53,
      "price_last_obs": "2026-08-01",
      "contribution_pp": 0.18,
      "null_note": "One search pass across Flowserve, Xylem, and Grundfos (2026-07-26) found no primary-source pump order-backlog metric with data-center relevance. Flowserve's Q1 2026 10-Q (SEC EDGAR, period ended 2026-03-31, https://www.sec.gov/Archives/edgar/data/30625/000003062526000012/fls-20260331.htm) reports one company-wide backlog of $2.9 billion, broken out only by aftermarket share and four generic end-market categories (energy, chemical, power generation, general industries) \u2014 \"data center\" appears zero times in the filing. Xylem and Grundfos publish narrative data-center-cooling product marketing but no order-backlog figure segmented (or even unsegmented, in Grundfos's case as a private foundation-owned company with no 10-K/10-Q) at a level meeting this board's primary-source bar. No pump maker is added to the long-lead board.",
      "backlog_group": null,
      "vendors": []
    }
  ],
  "backlog_months": {
    "electrical": {
      "label": "Electrical equipment (NAICS 335)",
      "months": [
        "2017-01",
        "2017-02",
        "2017-03",
        "2017-04",
        "2017-05",
        "2017-06",
        "2017-07",
        "2017-08",
        "2017-09",
        "2017-10",
        "2017-11",
        "2017-12",
        "2018-01",
        "2018-02",
        "2018-03",
        "2018-04",
        "2018-05",
        "2018-06",
        "2018-07",
        "2018-08",
        "2018-09",
        "2018-10",
        "2018-11",
        "2018-12",
        "2019-01",
        "2019-02",
        "2019-03",
        "2019-04",
        "2019-05",
        "2019-06",
        "2019-07",
        "2019-08",
        "2019-09",
        "2019-10",
        "2019-11",
        "2019-12",
        "2020-01",
        "2020-02",
        "2020-03",
        "2020-04",
        "2020-05",
        "2020-06",
        "2020-07",
        "2020-08",
        "2020-09",
        "2020-10",
        "2020-11",
        "2020-12",
        "2021-01",
        "2021-02",
        "2021-03",
        "2021-04",
        "2021-05",
        "2021-06",
        "2021-07",
        "2021-08",
        "2021-09",
        "2021-10",
        "2021-11",
        "2021-12",
        "2022-01",
        "2022-02",
        "2022-03",
        "2022-04",
        "2022-05",
        "2022-06",
        "2022-07",
        "2022-08",
        "2022-09",
        "2022-10",
        "2022-11",
        "2022-12",
        "2023-01",
        "2023-02",
        "2023-03",
        "2023-04",
        "2023-05",
        "2023-06",
        "2023-07",
        "2023-08",
        "2023-09",
        "2023-10",
        "2023-11",
        "2023-12",
        "2024-01",
        "2024-02",
        "2024-03",
        "2024-04",
        "2024-05",
        "2024-06",
        "2024-07",
        "2024-08",
        "2024-09",
        "2024-10",
        "2024-11",
        "2024-12",
        "2025-01",
        "2025-02",
        "2025-03",
        "2025-04",
        "2025-05",
        "2025-06",
        "2025-07",
        "2025-08",
        "2025-09",
        "2025-10",
        "2025-11",
        "2025-12",
        "2026-01",
        "2026-02",
        "2026-03",
        "2026-04",
        "2026-05",
        "2026-06",
        "2026-07",
        "2026-08"
      ],
      "ratio": [
        2.76,
        2.87,
        2.9,
        2.97,
        2.97,
        2.9,
        3.11,
        3.03,
        3.07,
        3.1,
        3.11,
        3.11,
        3.06,
        3.01,
        2.97,
        2.99,
        3.02,
        3.02,
        3.04,
        3.0,
        2.99,
        3.08,
        3.19,
        3.24,
        3.24,
        3.31,
        3.42,
        3.48,
        3.47,
        3.42,
        3.51,
        3.71,
        3.67,
        3.76,
        3.79,
        3.97,
        3.96,
        3.85,
        3.73,
        4.25,
        4.24,
        4.26,
        4.33,
        4.26,
        4.29,
        4.26,
        4.31,
        4.09,
        4.13,
        4.2,
        4.32,
        4.22,
        4.37,
        4.39,
        4.32,
        4.54,
        4.68,
        4.67,
        5.01,
        5.06,
        5.48,
        5.61,
        5.78,
        6.04,
        6.12,
        6.36,
        6.68,
        6.72,
        6.76,
        7.07,
        6.5,
        6.54,
        6.19,
        6.34,
        6.12,
        6.19,
        6.12,
        6.07,
        5.97,
        5.89,
        5.87,
        5.88,
        5.79,
        5.95,
        5.49,
        5.81,
        5.94,
        5.78,
        5.9,
        6.07,
        5.85,
        5.91,
        5.89,
        5.82,
        5.85,
        5.74,
        5.75,
        5.92,
        6.02,
        5.78,
        5.97,
        5.82,
        5.72,
        5.61,
        5.52,
        5.46,
        5.69,
        5.58,
        5.8,
        5.65,
        5.7,
        5.58,
        5.55,
        5.62,
        5.67,
        5.68
      ],
      "latest": 5.68,
      "latest_month": "2026-08",
      "change_1y": 0.07
    },
    "turbines": {
      "label": "Turbines, generators & power transmission (NAICS 333611)",
      "months": [
        "2017-01",
        "2017-02",
        "2017-03",
        "2017-04",
        "2017-05",
        "2017-06",
        "2017-07",
        "2017-08",
        "2017-09",
        "2017-10",
        "2017-11",
        "2017-12",
        "2018-01",
        "2018-02",
        "2018-03",
        "2018-04",
        "2018-05",
        "2018-06",
        "2018-07",
        "2018-08",
        "2018-09",
        "2018-10",
        "2018-11",
        "2018-12",
        "2019-01",
        "2019-02",
        "2019-03",
        "2019-04",
        "2019-05",
        "2019-06",
        "2019-07",
        "2019-08",
        "2019-09",
        "2019-10",
        "2019-11",
        "2019-12",
        "2020-01",
        "2020-02",
        "2020-03",
        "2020-04",
        "2020-05",
        "2020-06",
        "2020-07",
        "2020-08",
        "2020-09",
        "2020-10",
        "2020-11",
        "2020-12",
        "2021-01",
        "2021-02",
        "2021-03",
        "2021-04",
        "2021-05",
        "2021-06",
        "2021-07",
        "2021-08",
        "2021-09",
        "2021-10",
        "2021-11",
        "2021-12",
        "2022-01",
        "2022-02",
        "2022-03",
        "2022-04",
        "2022-05",
        "2022-06",
        "2022-07",
        "2022-08",
        "2022-09",
        "2022-10",
        "2022-11",
        "2022-12",
        "2023-01",
        "2023-02",
        "2023-03",
        "2023-04",
        "2023-05",
        "2023-06",
        "2023-07",
        "2023-08",
        "2023-09",
        "2023-10",
        "2023-11",
        "2023-12",
        "2024-01",
        "2024-02",
        "2024-03",
        "2024-04",
        "2024-05",
        "2024-06",
        "2024-07",
        "2024-08",
        "2024-09",
        "2024-10",
        "2024-11",
        "2024-12",
        "2025-01",
        "2025-02",
        "2025-03",
        "2025-04",
        "2025-05",
        "2025-06",
        "2025-07",
        "2025-08",
        "2025-09",
        "2025-10",
        "2025-11",
        "2025-12",
        "2026-01",
        "2026-02",
        "2026-03",
        "2026-04",
        "2026-05",
        "2026-06",
        "2026-07",
        "2026-08"
      ],
      "ratio": [
        7.16,
        7.13,
        6.56,
        6.3,
        6.09,
        6.52,
        6.39,
        6.2,
        5.56,
        5.58,
        5.69,
        5.41,
        5.89,
        5.9,
        5.82,
        6.28,
        6.19,
        6.15,
        6.76,
        6.33,
        6.35,
        6.56,
        6.54,
        6.96,
        7.13,
        7.17,
        7.24,
        7.37,
        7.42,
        7.65,
        7.9,
        8.1,
        8.01,
        7.96,
        8.85,
        8.8,
        8.99,
        9.54,
        10.17,
        11.08,
        10.53,
        10.19,
        10.43,
        10.51,
        10.44,
        10.29,
        9.93,
        9.11,
        9.4,
        9.41,
        9.36,
        9.25,
        9.18,
        9.1,
        9.01,
        8.78,
        8.67,
        8.77,
        8.77,
        8.49,
        8.32,
        8.71,
        8.71,
        8.87,
        8.78,
        8.8,
        8.66,
        8.55,
        8.35,
        8.32,
        8.56,
        8.57,
        8.66,
        8.49,
        7.96,
        7.94,
        7.87,
        7.83,
        8.11,
        8.3,
        8.46,
        8.48,
        8.58,
        8.37,
        8.71,
        8.9,
        8.75,
        8.7,
        8.63,
        8.57,
        8.92,
        9.18,
        8.95,
        9.29,
        9.0,
        8.61,
        8.77,
        8.73,
        8.76,
        8.79,
        8.5,
        8.41,
        8.35,
        8.46,
        8.27,
        7.98,
        8.26,
        7.82,
        8.21,
        7.97,
        7.36,
        7.4,
        7.56,
        7.49,
        7.35,
        7.19
      ],
      "latest": 7.19,
      "latest_month": "2026-08",
      "change_1y": -1.27
    }
  }
}